This page contains a conical of the projects in the winter of 2008 - 2009 for the racing season of 2009. The current list of projects is

Put the car on a diet (remove as much metal as possible)
            
inner fender wells
            
bracing under the hood and trunk lids
            
remove reinforcement in back of bumper covers 

Relocate the battery

Pull engine and replace rear main seal
 

Fuel cell in the trunk (remove old gas tank) 


Pull all the wiring and install race harness 

Engine Work
            
Possible cam swap
             Electric water pump
             Remove alternator 

 

Pull transmission and replace front seal
       install trans brake

Remove stock dash and install metal one with gauges


Install racing seat 

Possible gear swap in rear end 


Correct roll bar configuration
Remember click the picture for more detail!

Project for week ending 2008 11 01
 
This weekends project (it might be easiest to pull the whole front clip)
        Get the car up on blocks (I may have this done)
        remove hood and hang on garage wall
                      hinges
                      inner fender wells,
                      front bumper,
                      radiator etc until time is gone

Project for week ending 2008 11 08
 
This weekends project Remove the engine and transmission and install the engine on an engine stand.



 

 

Project for week ending 2008 11 15
 

This weekends project Remove the dash, gas tank, and rear bumper.

We also had a presentation on how to install AN fitting onto braided steel lines

 

 

Project for week ending 2008 11 22

Pull the timing chain cover and see if we can identify the cam that is in the engine.

Start on the build of the tube frame for the rear bumper cover.

Install of the fuel cell and battery box.



Project for week ending 2008 11 29

This weekends project gathering was canceled due to Thanksgiving. I worked on several small projects to try and keep the momentum up on the car. They included the fuel cell install, Fuel Pump and Filter mounting bracket, and engine ID

 

Project for week ending 2008 12 06

This weekends project
 

 


Click the picture or this text to go to engine work at the machine shop.


Project for Week 2008 12 13
 

 

 